← HO FUTURE/KA-AI FLAGSHIP/WORKFLOW REVIEW
UNDER REVIEW · 2026-07-24
Carrying → TOTAL
STAGE A · 01 / 03

Inspire 靈感 · photo → recommendation

Your room drives the design — not a showroom.由你的房間主導設計,而非現成陳列室樣板。

Upload a room photo. KA-AI reads the room — type, style, and an estimated usable-wall extent (confirmed at 度尺 / field measure) — then proposes fit + style recommendation cards built from the real module catalogue. Pick one; it carries into Stage B. No form to fill. Every AI call is user-clicked.

YOUR ROOM · AWAITING YOUR PHOTO房間待上載
DRAFTING · awaiting a room photo
02 · WARDROBE ALCOVE
06 · BED ZONE
03 · TV / FEATURE WALL
~3.2 m usable wall
~2.4 m
SCAN · room.jpg
AI estimates: Bedroom · ~11 m² · back wall ~3.2 m · ceiling ~2.4 m · 1 window (left) · alcove (left)  →  3 fit-matched directions尺寸為相片估算,非實測 · estimated from photo — confirmed at 度尺 / field measure
Room type · 房間類型 — tune the suites below
Your fit-out starts with your room — upload to see it
no photo? watch the sample run — press the button
TRANSITION · A → B · T1 EXTRACT & CARRY

Your choices travel into the room 選擇化作房間

A · PHOTOB · BLUEPRINT
02wardrobe
06bed platform
03tv wall
3200 mm back wall
detected elements become outlined cutout chips · they step across the seam (X-then-Y) · land on the blueprint wall · dimension lines draw in
STAGE B · 02 / 03

Calibrate 校準 · the archviz configurator

Your fit is already pre-loaded — dial in the details, watch the price move.配置已預載 — 調整細節,即時睇報價。

Stage A's pick arrives pre-loaded into the live configurator (already at /future/design). Calibrate quantity, bed size, and fit-to-flat scale — the HK$ quote updates live. The elevation lifts into a 2.5D view so the product gains dimensional body. Real figures, unchanged.

ELEV · A-101 · 1:50
02
06
03
2.5D · preserve-3d · +Z depth

Build your fit-out

雍明苑 Yung Ming Court (TKO) · ~450 ft² · HOS layout loaded

Carried from Inspire
① Quantity & type
② Bed size
③ Fit & scale
Layout size · fit-to-flat100%
Instant Quote · KA-AI
Typical HK retail · traditional
You save ·
Designd 1–3
Renderd 3–5
Factoryd 5–16
Installd 20
TRANSITION · B → C · T3 INTO THE MACHINE

The room explodes into parts 房間拆解成零件

→ sheet set A-201…A-206
the exploded-view mechanic · 6 real panels settle out of the carcass and stack into the engineering sheet set
STAGE C · 03 / 03

Produce 生產 · the engineering sheet set

Every module you chose is now a certified factory document.每個選定模組,已成為工廠認證文件。

Every configured product becomes a factory-grade document set — dimensioned elevation with call-outs, exploded isometric, System-32 drill map, section + edge-band schedule, hardware BOM with part numbers, tolerance block, live G-code, revision table. All derived by Kerf from the real vanity_600×550×460. Then the production price and the two subscription tracks.

3D REVIEW — engine-true · explode · x-ray · door-swing

Confirm the configuration as a factory-verified 3D model — orbit, explode the assembly into parts, toggle x-ray, swing the doors. Built by Kerf from real engineering data.

Open 3D review →

KAWebGLGuard · no 2nd WebGL context · pointer:coarse stays on this card

A-201 · WASHROOM VANITY — ELEVATION · numbered call-outs · mm
PART SCHEDULE · 6 panels · 18 mm MFC · hover to cross-highlight
#PartW×HTBores
SheetA-201
TitleVANITY — ELEVATION / SCHEDULE
Scale1:5
Tol.±2 mm
RevA
A-203 · EXPLODED ISOMETRIC · 6 parts · assembly order
SheetA-203
TitleEXPLODED ISO
JoineryMinifix
SrcKERF
A-204 · DRILL MAP · P01 side · System-32 · real bore centres
P01/P02 side · 28 × Ø5 P03/P04 top·btm · 4 × Ø15 minifix P06 door · 2 × Ø35 Blum cup pitch 32 mm · edge offset 37 mm
SheetA-204
TitleDRILL MAP · 66 BORES
Machinegeneric_router_5×10
A-202 · SECTION A–A + EDGE-BAND SCHEDULE · exposed faces
PanelBanded edgesLength
P01/P02 sidefront edge ×21,100 mm
P03/P04 top·btmfront edge ×21,128 mm
P06 doorall 4 edges2,284 mm
P05 backnone (concealed)0 mm
edge-band total 4.51 m · 1 mm ABSderived from exposed faces
SheetA-202
TitleSECTION + EDGE-BAND
Board18 MFC
A-205 · HARDWARE BOM · real part numbers · per unit
ItemPart no.Qty
Cam housingminifix_158
Cam boltminifix_bolt_b348
Cover capminifix_cover_cap8
Doweldowel_8x308
Shelf pin Ø5shelf_support_pin4
Hinge · clip-topblum_clip_top_hinge2
Hinge armblum_clip_top_hinge_arm2
40 pieces · 4 corners Minifixgate: joinery feasible
SheetA-205
TitleHARDWARE BOM
SrcKERF
A-206 · G-CODE · drill.nc · generic_router_5×10 · 66 bores
%
O1001 (KA-AI STAGE C — PER-MODEL CNC DRILLING JOB)
(MODEL vanity_600x550x460  MACHINE generic_router_5x10)
(UNITS mm  ABSOLUTE  DATUM bottom-left A-side)
(BORES 66)
G21 (mm)
G90 (absolute)
(PART P01_side_L  BORES 28)
(BORE P01_side_L FACE A TOOL S5 DIA 5)
G81 X37 Y64 Z-13 R5
G81 X423 Y64 Z-13 R5
G81 X37 Y96 Z-13 R5
G81 X423 Y96 Z-13 R5
… 24 more @ 32 mm pitch …
G80
(PART P03_top  BORES 4 · minifix Ø15)
G81 X8 Y37 Z-13 R5
G81 X556 Y37 Z-13 R5
G80
(PART P06_door  BORES 2 · Blum Ø35 FACE B)
G81 X22.5 Y100 Z-12.5 R5
G81 X22.5 Y446 Z-12.5 R5
G80
M30
%
.step.dwg.stl drill.nc · 66 borenest · 1 sheet
SheetA-206
TitleCNC DRILL PROGRAM
Formatdrilljob
TOLERANCE BLOCK & REVISION TABLE
general tol ±2 mm grid System-32 board 2440×1220×18 nest 1 sheet
RevDateNote
A2026-07-23Kerf derive · gate PASS · nested 1 sheet
2026-07-23audit: board / holes / boring / joinery · all ✓
boring feasible 64 gang · 2 router-cup assembly clash-free
PkgA-201…A-206
TitleTOLERANCE / REVISIONS
GatePASS
PRODUCTION LISTING
Japandi sleep suite 日式睡房
02 Wardrobe · 06 Bed + storage platform · 03 TV / living wall
HK$64,000HK$102,000−37%
20 days vs 84 traditional
±2 mm CNC tolerance
6 sheets · full BOM
B2C homeowner
Browse, scan & design free. Pay only when you place a production order.
  • Free to design & render
  • Pay-on-production (credits)
  • HK delivery + install
PRICING = CEO DECISION
B2B manufacturer
Subscription for factories: the professional output pipeline.
  • Blueprint pack (sheets + BOM)
  • G-code / .step / .dwg export
  • Quote-pipeline access
PRICING = CEO DECISION
Act 04 · Manufacture — new
The sheet isn't the end. Watch it become real.
The same engine-true cabinet drifts apart into its panels, its 262 bores light up, the two gates run, and it arrives in the flat — one continuous camera, no cut. 同一件工程真實的櫃散開成板件,262 個鑽孔亮起,兩道閘運行,最後送到你家 — 一鏡到底。
Enter the workshop →
Act 04 · Manufacture — scroll to run the floor · open full →
ROLLOUT · EACH STEP CEO-REVIEWABLE, REVERSIBLE

The order we build it 建造次序

1This spec + the animated preview → CEO reviewYou are here
2A-lite: upload → analysis → recommendation cards → carry into B (no image-gen)
3C-lite: blueprint sheet deriver + read-only price listing
4Transition animations to full polish (T0–T3, this preview's motion system)
5Subscriptions: B2C credits, then B2B manufacturer tier (pricing = CEO decision)
6Walkthrough test wired into the daily flagship lane (ship-gate)
This is the workflow under review. 此為送審流程。

Motion & Experience System v1 — Stage A INSPIRE → B CALIBRATE → C PRODUCE, with the named transitions T0 COME CLOSER · T1 EXTRACT & CARRY · T2 LIFT TO DEPTH · T3 INTO THE MACHINE. HK$ figures and modules are the live /future/design data; the Stage C sheet set is the real Kerf-derived vanity_600×550×460 (66 bores, System-32, real part numbers + G-code). Subscription pricing is a CEO decision, not set here.  ·  kaa-i